Sign In | Join Free | My china-telecommunications.com |
|
Brand Name : Topleader
Model Number : Rail Transfer Cart
Certification : CE,ISO9000
Place of Origin : China
MOQ : 1 set
Price : $3000-$12000
Payment Terms : L/C, T/T, Western Union
Supply Ability : 600 sets/year
Delivery Time : 30-40 days after receive your prepayment
Packaging Details : The whole Material Handling Transfer Cart will be packed by the tarp, the parts will be packed by polywood case.
Product name : Low Bed 30T Heavy Load Battery Powered Rail Flat Transfer Platform Trolley
Power supply : Electric Power or Custom
Key Words : steering electric transfer cart
Load capacity : 1-300T
Running speed : 0-20m/min
Application : Factory ,warehouse and working line
Warranty : 1 year
Color : customized
OEM : Accepted
The low bed 30t heavy load battery powered rail flat transfer platform trolley is divided into two types: track and trackless. The rail transfer platform trolley is also one of the more widely used types, and is used by many factories, enterprises and heavy industry workshops. The transfer platform trolley is driven by electricity. As a transfer platform trolley that is driven, walked, and transported by electricity, its driving device is a DC motor or an AC motor, and the motor, reducer, shaft, etc. drive the wheels to rotate, and the remote controller applies operations such as forward, backward, and stop. The transfer platform trolley is used for rapid material handling in workshops, warehouses, factories, industrial areas and other places. It has the advantages of simple structure, convenient use, easy maintenance, large carrying capacity and less pollution. It is widely used in machine manufacturing, warehouses and metallurgical plants, etc., as the interior of the workshop to cooperate with the crane to transport heavy objects over the span. Such as: transportation of raw materials, machining and finished products.
Rated load (T) | 2 | 10 | 20 | 30 | 50 | 63 | 150 | |
Table size | length(L) | 2000 | 3600 | 4000 | 4500 | 5500 | 5600 | 10000 |
Width(W) | 1500 | 2000 | 2200 | 2200 | 2500 | 2500 | 3000 | |
Height(H) | 450 | 500 | 550 | 600 | 650 | 700 | 1200 | |
Wheel Base (mm) | 1200 | 2600 | 2800 | 3200 | 4200 | 4300 | 7000 | |
Rail Inner Gauge (mm) | 1200 | 1435 | 1435 | 1435 | 1435 | 1435 | 2000 | |
Wheel Diameter(mm) | Φ270 | Φ300 | Φ350 | Φ400 | Φ500 | Φ600 | Φ600 | |
Wheel Quantity | 4 | 4 | 4 | 4 | 4 | 4 | 8 | |
Ground Clearance (mm) | 50 | 50 | 50 | 50 | 50 | 75 | 75 | |
Running speed (min) | 0-25 | 0-25 | 0-20 | 0-20 | 0-20 | 0-20 | 0-18 | |
Max Wheel Load (KN) | 14.4 | 42.6 | 77.7 | 110.4 | 174 | 221.4 | 265.2 | |
Reference Weight (t) | 2.8 | 4.2 | 5.9 | 6.8 | 8 | 10.8 | 26.8 | |
Recommended Rail Model | P15 | P18 | P24 | P38 | P43 | P50 | QU100 |
The electric power material handling transfer carts are widely applied in assembly line (ring production line, loop production line), metallurgy industry (steel ladle), warehouse transport, ship industry (maintenance, assemble, container transport), workpiece transport in workshop, lathe transport, steel factory(steel billet, steel plate, steel coil, steel pipe, section steel, steel structure), construction(bridge, simple building, concrete, concrete column), petroleum industry(oil pump, sucker rod and parts), energy(polycrystalline silicon, generator, windmill), chemical industry(electrolytic cell, retort etc), railway(rail maintenance, rail welding, train tractor).
Q: What is the leading time, delivery term, and payment term?
A: Usually our leading time is 30 days.
tags:steel plant steerable transfer vehicle,steel plant rail vehicle
![]() |
Low Bed 30t Heavy Load Battery Powered Rail Flat Transfer Platform Trolley Images |